ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Walls... Dark yellow to match existing Date: November 7, 2014Permit type: Vcc paint | Permit status: Permit issued | Expiration date: May 20, 2015 | Current use: Business use | Permit id: 14-36395-Vcpnt | |||||
Remove second floor casement windows installed without a permitinstall new six-over-six, wood casement windows in second floor window openings to match third story windows in color, size, material, detail, profile and exposure2016. 04. 05 - permit not picked up. Date: November 7, 2014Permit type: Vcc general work | Permit status: Permit expired due to ina | Completion date: April 5, 2016 | Expiration date: May 20, 2015 | Current use: Business use | Permit id: 14-36397-Vcgen | |||||
Remove all existing, unpermitted and/or unshielded light fixturesinstall (2) remcraft lighting 1 series outdoor cylindrical bullet security spot light to the underside of the gallery centered over the residential entrance and central, commercial entrancefixtures shall be painted to match adjacent building surface. All conduit and wiring shall be placed along the inside corners of building surfaces as much as possible, such as along gallery/balcony purlins at the deck line, and painted to match the adjacent surfaces. All fixtures shall use lamps with the following criteria: 3000k color temperature, 80+ color rendering index, and 800-12 lumens per bulb Date: December 4, 2014Permit type: Vcc general work | Permit status: Permit issued | Expiration date: June 4, 2015 | Current use: Business use | Permit id: 14-37554-Vcgen | |||||
1. Remove existing faux slate roof and ridge tiles from main house and from rear slave quarter building. 2. Replace or repair decking and rafters in kind, as necessary, and install all new flashing, in galvanized metal. 3. Install new natural slate on main house and on slave quarter; (type to be spanish samaca black). Reinstall existing ridge tiles. 4. Install new 6" half-round gutters, collector heads and 4" downspouts for both buildings, in galvanized metal; gutters will be painted white, to match the trim/fascia; collector heads & downspouts will be painted to match the wall. 5. Fabricate and install stainless metal box valley behind front parapet. 6. Remove two skylights added to rear slope of main house roof in the late 1970s; patch rafters, install new decking, and roof over the holes. Note: trash chutes are required for removal of debris from all roofs all work must conform to standard vcc policies & guidelines permit does not allow for cap flashing on parapet or surrounding wallstorc Date: April 12, 2013 Value: $51,000Permit type: Vcc general work | Permit status: Permit issued | Expiration date: October 12, 2013 | Current use: Multi-family | Permit id: 13-11478-Vcgen | |||||
Proposal to retain casement dormer window installed without benefit of a permit, per application received 09/04/14. [notice of violation received 08/26/14]confirmation letter returned to office 5/22/15 (postmarked 1/29/15) Date: September 4, 2014Permit type: Vcc general work | Permit status: Voided - applicant withdr | Completion date: February 5, 2015 | Current use: Business use | Permit id: 14-28978-Vcgen | |||||
Retention of air conditioner condenser unit on balcony, installed without benefit of permit, for the remaining life of the unit; once the unit needs repair or replacement, the condominium owner must return to the vcc for approval of installation at a policy-guided location. Note: permit issued in response to violations. Work shall commence no less than days after permit is issued. Work must be completed no less than days after work begins. Owner will call vcc for final inspection upon completion of work. Proposal to retain air conditioning unit on balcony installed by previous owner without benefit of a permit, per application received 09/03/14. [notice of violation received 08/26/14]2016. 04. 05 - permit not picked up. Yes, work performed. Date: September 3, 2014Permit type: Vcc general work | Permit status: Permit expired due to ina | Completion date: April 5, 2016 | Expiration date: April 6, 2015 | Current use: Business use | Permit id: 14-28976-Vcgen | |||||
Proposal to retain casement dormer window installed without benefit of a permit, per application received 09 04 14. [notice of violation received 08 26 14]confirmation letter returned to office 5 22 15 (postmarked 1 29 15) Date: September 4, 2014Permit type: Vcc general work | Permit status: Voided - applicant withdr | Completion date: February 5, 2015 | Current use: Business use | Permit id: 14-28978-Vcgen | |||||
Remove all existing, unpermitted and or unshielded light fixturesinstall (2) remcraft lighting 1 series outdoor cylindrical bullet security spot light to the underside of the gallery centered over the residential entrance and central, commercial entrancefixtures shall be painted to match adjacent building surface. All conduit and wiring shall be placed along the inside corners of building surfaces as much as possible, such as along gallery balcony purlins at the deck line, and painted to match the adjacent surfaces. All fixtures shall use lamps with the following criteria: 3000k color temperature, 80+ color rendering index, and 800-12 lumens per bulb Date: December 4, 2014Permit type: Vcc general work | Permit status: Permit issued | Expiration date: June 4, 2015 | Current use: Business use | Permit id: 14-37554-Vcgen | |||||
1. Remove existing faux slate roof and ridge tiles from main house and from rear slave quarter building. 2. Replace or repair decking and rafters in kind, as necessary, and install all new flashing, in galvanized metal. 3. Install new natural slate on main house and on slave quarter; (type to be spanish samaca black). Reinstall existing ridge tiles. 4. Install new 6" half-round gutters, collector heads and 4" downspouts for both buildings, in galvanized metal; gutters will be painted white, to match the trim fascia; collector heads & downspouts will be painted to match the wall. 5. Fabricate and install stainless metal box valley behind front parapet. 6. Remove two skylights added to rear slope of main house roof in the late 1970s; patch rafters, install new decking, and roof over the holes. Note: trash chutes are required for removal of debris from all roofs all work must conform to standard vcc policies & guidelines permit does not allow for cap flashing on parapet or surrounding wallstorc Date: April 12, 2013 Value: $51,000Permit type: Vcc general work | Permit status: Permit issued | Expiration date: October 12, 2013 | Current use: Multi-family | Permit id: 13-11478-Vcgen | |||||
Retention of air conditioner condenser unit on balcony, installed without benefit of permit, for the remaining life of the unit; once the unit needs repair or replacement, the condominium owner must return to the vcc for approval of installation at a policy-guided location. Note: permit issued in response to violations. Work shall commence no less than days after permit is issued. Work must be completed no less than days after work begins. Owner will call vcc for final inspection upon completion of work. Proposal to retain air conditioning unit on balcony installed by previous owner without benefit of a permit, per application received 09 03 14. [notice of violation received 08 26 14]2016. 04. 05 - permit not picked up. Yes, work performed. Date: September 3, 2014Permit type: Vcc general work | Permit status: Permit expired due to ina | Completion date: April 5, 2016 | Expiration date: April 6, 2015 | Current use: Business use | Permit id: 14-28976-Vcgen |